Skip to content
Building materials. Project by project.Talk to our team · 02 9055 9575
MY META · IDEAS & PLANNING

Project notes

Underfloor insulation: planning access and fit — MY META project note

Underfloor insulation: planning access and fit

Measure the accessible underfloor area and record the structural layout before discussing insulation. Ask the installer to identify the suitable product and support arrangement, along with any access, moisture or services issues that need attention first.

Reflective foil and bulk insulation: comparing roles — MY META project note

Reflective foil and bulk insulation: comparing roles

Ask the project assessor how reflective and bulk products are intended to work in the proposed construction. Use the documented arrangement when comparing products and quantities, rather than treating different insulation forms as direct substitutes.

Roof sarking: preparing the material list — MY META project note

Roof sarking: preparing the material list

Discuss roof sarking with the roof design and installation sequence in view. Record the specified product and the details needed at edges, laps and service penetrations before estimating rolls and compatible accessories.

Blueboard: confirming the intended application — MY META project note

Blueboard: confirming the intended application

Identify the exact product described as blueboard before selecting a coating or wall detail. Ask for the current installation and finishing instructions for the intended application, and confirm the compatible accessories with the responsible installer.

X-ray shielding linings: information for the specialist — MY META project note

X-ray shielding linings: information for the specialist

Radiation-shielding selection needs a suitably qualified specialist’s project specification. Prepare the room layout and service information for that specialist, and order only the documented lining system and accessories rather than selecting a board as a standalone solution.

Wall insulation: preparing a room-by-room schedule — MY META project note

Wall insulation: preparing a room-by-room schedule

Prepare a separate schedule for each wall construction or room condition. Record the project requirement and available space before selecting dimensions and quantities, and coordinate the work with the lining and services sequence.

External cladding: starting a product brief — MY META project note

External cladding: starting a product brief

Begin a cladding brief with elevations, site conditions and the intended wall construction. Use those documents to discuss profiles and finishes, then record the complete system and accessory list before estimating quantities.

Multi-performance plasterboards: matching the brief — MY META project note

Multi-performance plasterboards: matching the brief

List the performance requirements that apply together in the same wall or ceiling. Ask which documented assembly and product combination addresses that list, rather than assuming a multi-performance label permits substitutions throughout a project.

Ceiling-tile types: preparing a comparison — MY META project note

Ceiling-tile types: preparing a comparison

Build a comparison around the intended room and ceiling system. Record the tile material, edge and module along with the relevant finish, maintenance and performance requirements before deciding on a replacement or new ceiling.

LET’S GET YOUR PROJECT MOVING

The right materials start
with a conversation.

Talk to MY META ↗